This has gone on repeatedly, every week, in the late great USA for ten years. They dishonored the dead by stealing. Now the government says it has no money, yet they keep this up week after week as their manufactured, staged, debt ceiling "crisis" approaches.
And you dare hold your noses to me ?
You're crooked. I'm not.
SPQR
File Number 0004792918 Radio Service PW - Public Safety Pool, Conventional
Call Sign Application Status 2 - Pending
8 Frequencies for all locations
Action Performed Frequency Loc# Ant# FreqID StationClass Units PagingRec. OutputPower MaximumERP
Add 000453.82500000 1 1 1 FB2 1 150 50.000 50.000
Add 000453.92500000 1 1 2 FB2 1 150 50.000 50.000
Add 000453.82500000 2 1 1 MO 75 50.000 50.000
Add 000458.82500000 2 1 2 MO 75 50.000 50.000
Add 000453.92500000 2 1 3 MO 75 50.000 50.000
Add 000458.92500000 2 1 4 MO 75 50.000 50.000
Add 000458.82500000 3 1 1 FX1 10 50.000 50.000
Add 000458.92500000 3 1 2 FX1 10 50.000 50.000
File Number 0004792918 Radio Service PW - Public Safety Pool, Conventional
Call Sign Application Status 2 - Pending
3 Total Locations
Location 1 - REPEATERS (Fixed)
Frequencies (2)
Transmit Location
23 YANKEE DR (WATER TANK)
BREWSTER, MA
BARNSTABLE County
Coordinates 41-45-14.0 N, 070-04-22.0 W
Site Elevation
(AMSL) 38.4m Height w/o
Appurtenances 32.2m
ASR # N/A Height w/
Appurtenances 38.3m
Support Structure Type TANK - Any type of tank, water, gas, etc.
Airport Identifier Site Status P
NEPA Required No
Quiet Zone Notification Date Quiet Zone Consent
Is coordination with Canada required?
Is coordination with Mexico required?
Antenna 1
Action Performed Add
HAAT 67.1 Hgt to Tip 38.3m Polarization V - Vertical
Azimuth 360.0° Beamwidth 360.0° Gain
Location 2 (Mobile) arrow Frequencies (4) 25.0 km radius around a fixed location 1
NEPA Required No
Quiet Zone Notification Date
Quiet Zone Consent
Is coordination with Canada required? No
Is coordination with Mexico required?
Location 3 (6.1 meter control station) arrow Frequencies (2) Land Mobile Control Station meeting the 6.1 Meter Rule in the state of MA.
NEPA Required No
Quiet Zone Notification Date
Quiet Zone Consent
Is coordination with Canada required?
No Is coordination with Mexico required?
No comments:
Post a Comment